Net Metering in Pakistan 2026: How to Apply and Rates

The rules for net metering in Pakistan changed fundamentally in 2026. NEPRA notified the Prosumer Regulations 2026 on 9 February 2026, replacing the one-to-one net metering system from 2015 with a new “net billing” framework for all new applicants. Under the new rules, exported solar electricity earns roughly Rs. 10 to Rs. 11 per unit while imported electricity costs up to Rs. 50 to Rs. 60 per unit. This guide explains how the scheme — now net billing — works in October 2026, who is affected, and exactly how to apply.
Net Metering vs Net Billing: What Changed in 2026
Under the old 2015 net metering system, exported and imported units cancelled each other one-for-one, and the export buyback rate was around Rs. 25.32 to Rs. 25.9 per unit. Under the new net billing framework, the system calculates the monetary value: exports earn about Rs. 10 to Rs. 11 per unit (the national average energy purchase price) while imports are charged at the full retail tariff. So 100 exported units now earn roughly Rs. 1,100 in credit, while 100 imported units cost around Rs. 6,000 — a net bill of Rs. 4,900 where the old system gave zero. Existing consumers with valid agreements signed before 9 February 2026 keep their old terms, including the higher buyback rate, until their contracts expire.
Other key changes under the 2026 regulations: contracts now run 5 years instead of 7, renewable by mutual consent; system size is capped at 1MW and cannot exceed the consumer’s sanctioned load; no new connections if transformer-level generation reaches 80% of rated capacity; systems of 250kW and above need a load flow study; a non-refundable NEPRA concurrence fee of Rs. 1,000 per kW applies; and all interconnection costs are borne by the prosumer. Around 4,66,000 registered prosumers exist in Pakistan, with 82% concentrated in 11 major cities, led by Lahore.
How to Apply in 2026: Step by Step
Follow these steps to apply for net metering — now processed as net billing — with your DISCO:
1. Size your system and hire a certified installer. Calculate your load, choose a system size within your sanctioned load, and select a NEPRA/DISCO-approved inverter. You must hire a licensed solar installer — self-installed systems are not approved.
2. Prepare your documents. You need a copy of your CNIC, property ownership proof, your latest electricity bill, the solar system design, technical specifications of panels and inverter, the installer certificate, and a signed affidavit/undertaking.
3. Submit the application to your DISCO. File the application with all documents and pay the Rs. 1,000 per kW processing fee. The DISCO must acknowledge your application within 5 working days and complete the technical review within 15 days.
4. Technical evaluation and meter installation. The DISCO inspects the system for safety and compliance, then installs a bi-directional meter within 15 days after payment. NEPRA concurrence is issued within 7 working days.
5. Activation. Once the bi-directional meter is installed and the agreement is signed, your system goes live and exported units begin earning credit at the net billing rate.
Is Net Metering Still Worth It in 2026?
Despite the lower buyback rate, net metering remains worthwhile for the right user profile. Homes and businesses with high daytime consumption — running air conditioners, shops and factories during daylight — save the most, because self-consumed solar directly offsets expensive grid power. Mixed-occupancy homes benefit moderately, while homes empty all day see the weakest returns and should size systems to daytime load or add battery storage. Right-sizing is now critical: oversized export-focused systems earn little at Rs. 11 per unit. Before investing, check our solar panel prices guide and inverter prices guide to budget accurately.
For the official-style breakdowns, see Scope Solar’s net billing explainer and the 2026 net billing guide on CheckYourBill.
Frequently Asked Questions
What is the export buyback rate in 2026?
New applicants earn roughly Rs. 10 to Rs. 11 per exported unit under net billing; existing pre-February 2026 consumers keep about Rs. 25.32 per unit until contract expiry.
How long does the prosumer contract last?
New contracts run 5 years, renewable for another 5 years by mutual agreement, down from 7 years under the old rules.
What is the Rs. 1,000 per kW fee?
A non-refundable NEPRA concurrence fee charged per kW of installed capacity on new net billing applications.
Can I exceed my sanctioned load?
No. New installations cannot exceed 100% of your sanctioned load, and systems above 25kW need additional NEPRA licensing.
How long does approval take?
The DISCO must acknowledge in 5 working days, complete technical review in 15 days, and install the interconnection within 15 days after payment.
Net Metering in Pakistan: Application and Rates Guide
Net metering lets solar owners export surplus electricity to the grid and earn credits against their bills. To net metering apply online, submit an application to your distribution company with your system details and load requirements. The net metering in pakistan cost includes the bi-directional meter, application fee and inspection charges.
Current net metering rates 2026 determine how much your exported units are worth, so check your disco’s latest tariff before sizing your system. For Lahore-area applicants, lesco net metering procedures are published on the company’s website with helpline support.
Frequently Asked Questions
How long does approval take? Typically several weeks from application to meter installation, depending on the disco’s backlog.
What system size can I install? Up to your sanctioned load, with larger systems needing additional approvals.
More Net Metering Practical Advice
Net metering economics depend on your consumption pattern: households using most electricity during daytime solar hours benefit most. To net metering apply online successfully, ensure your installer provides the technical documentation the disco requires. The net metering in pakistan cost beyond the meter includes earthing, safety equipment and inspection fees.
Review the net metering rates 2026 for exported units versus imported units to size your system correctly. Lesco net metering applicants in Lahore report smoother processing when applications are complete and the installer is experienced with the utility’s requirements.
Most Popular
How-ToPTA Tax Calculator 2026: Check Mobile Tax on Any Phone89 views
BISPPunjab Driving License Scam Alert: Fake Websites & “Without Test” Fraud | UrduPro80 views
Canada JobsTech Jobs in Canada: Roles, Salaries, and Skills Needed76 views
BusinessTech Stocks Trillion Loss: $1 Trillion Wiped Out as Oil Hits $11066 views
TechnologyTecno Mobile Prices in Pakistan 2026: Spark, Camon and Pova Series Compared65 views
ShowbizWomen’s Fashion in Pakistan 2026: Trends, Brands and Style Guide61 views